Some months ago Mr Venturi kindly emailed more photographs of the Marayong Camp taken in the mid 1950s by his father. The photographs show the Marayong office and steelworks under construction (1956).
He also sent a black and white photo showing the preparation (cut, shape and galvanisation) of the steel girders used in the transmission line towers.
Transmission Lines 1955–1974 is a project by Linda Carroli. It documents my father’s working life as a rigger and linesman with the Electric Power Transmission and its Italian parent company. He kept a photographic record of his working life and the photographs featured in this map are his personal photographs from Australia and Italy in the period 1955 to 1974. He commenced work in Italy in 1954 and remained working with EPT until 1975.
View Transmission Lines 1955 to 1974 in a larger map.
15 November 2010
Subscribe to:
Post Comments (Atom)
1 comment:
Does anyone rememeber the actual street address of the property at Marayong?
Post a Comment